When did the Channel Tunnel officially open?
1994 AD
The Channel Tunnel officially opened in 1994. It connects Folkestone in Britain with Coquelles in northern France beneath the English Channel. The crossing created a fixed rail link between Great Britain and continental Europe, allowing journeys that previously required a surface sea crossing or a flight.
Although cars and lorries travel through it, the tunnel is a railway rather than a road that motorists drive along. Vehicle shuttle trains carry road traffic between terminals, while passenger and freight trains also use the link. This distinction explains how the same infrastructure can serve travellers remaining with their vehicles and passengers making an international train journey.
The complete route is about 50 kilometres long, with roughly 38 kilometres beneath the sea. Its modern construction began in 1988, after earlier schemes had failed to produce an operating link. The meeting of excavation teams, completion of engineering work and introduction of individual services are different milestones within that project. For the official opening, the relevant year is 1994; it is later than the start of tunnelling and earlier than some subsequent rail improvements on the approaches.